Saturday, September 11, 2010

Loving the bathroom!

Had to change the vanity light. The other one was too heavy and really pulled down. Found a different one that we actually like better. Still have to deal with the mirror. Not sure what we're going to do yet, but it'll need cut.
Can't believe the sink is installed. It wasn't supposed to be in until next Tuesday, but thankfully it came in on Friday and we had it delivered today. Luckily my dad was here to help Jason install it.
Yay...we have a toilet! Found this shower curtain today and fell in love.
George, our tile guy, has done an awesome job on the tiling in the shower. I think this is my favorite part of the whole room. Too bad we have to cover it up with a curtain. Maybe someday we'll put a glass door on it.

Sunday, September 5, 2010

More bathroom progress

Well we're not as far along on the bathroom remodel as we'd hope, and we have Lowe's to thank for that. Our countertop came in damaged on August 11, and no one bothered to call us about it. Luckily we found out (2 weeks after the fact) because a new one still hadn't been ordered. We got the ball rolling on that, so our new sink should be in next week...hopefully not damaged. We've got the floor tiled, a new light fixture, and new plumbing for the sinks (thanks Tim!). Next on the list...shower tile and a toilet. Once the sink comes in, we should be about finished. Can't wait to have the bathroom back!